Microsoft 已停止使用 Oracle 租用的 AI 伺服器,原因是 Oracle 的硬體使用舊版 Nvidia GPU,無法符合 Microsoft 的規格。
AI 伴隨問答
針對這篇報導有疑問?可直接點選快捷問題或向 AI 追問背景脈絡與技術細節:
Bloomberg: Microsoft is switching off AI servers it rented from Oracle after declining to renew a 2023 contract built around Bing.
The capacity lost value over time because Oracle’s hardware ran older-generation Nvidia chips that no longer matched Microsoft’s specifications, according to people familiar with the matter.
Basically, Microsoft pays per GPU-hour. A Blackwell GPU produces several times more inference output than an H100 for similar power, so each Hopper or Ampere hour now buys far less work.
Current frontier models, often large mixture-of-experts designs, need lots of memory and fast links between GPUs. An H100 has 80GB of memory and talks quickly to only 8 GPUs in its server. Blackwell racks link 72 GPUs as one unit, with 192 to 288GB each. Big models either don’t fit on the old boxes or run slowly across their slower network.
Oracle says demand for its AI infrastructure remains strong, and in September it renewed contracts for 4-year-old GPUs at a 20% premium to the original price.